Transforming Operational Reliability

CASE STUDY

Migration of a proprietary HMI system to the Ignition platform to improve reliability and operational efficiency at a calcium carbonate milling facility.

OBJECTIVE: The project aimed to migrate the HMI to Ignition to ensure continuous operation and minimize unplanned downtime, which was essential for the client’s business continuity.

CHALLENGE: Frequent downtime with the inability to troubleshoot due to limited access to a proprietary application source code.

AVEVA PI

BACKGROUND: A calcium carbonate mill that processes and grinds calcium carbonate to specific recipes and sizes, then distributes the product via storage silos to trucks or rail cars for delivery, had an existing control system that was beginning to fail sporadically. This led to reliability issues, including frequent server and control system lockups that sometimes resulted in full-shift downtime and caused safety concerns due to loss of control. This downtime risked production losses, profitability, and potential loss of customers.

Solution

HMI Migration Project

After consultation and plant optimization services, the HMI was identified as the primary source of operational issues, prompting the proposal for an HMI migration project. The project involved a full migration of the HMI to the Ignition Perspective platform on new, modern hardware, replacing unreliable software and obsolete server hardware. This included visualization, tag historian, and full SCADA functionality while retaining the existing PLC and controls, enhancing system reliability and maintainability.

Migrating to a more industry-standard HMI platform would facilitate easier troubleshooting, configuration, and future scalability, addressing the limitations of the previous proprietary system. The new system is non-proprietary, widely supported, and well-documented, enabling the client and local integrators to provide effective support, faster problem resolution, and reducing dependence on a single provider.

The mill valued having a knowledgeable local integrator for rapid support and quick troubleshooting during critical downtime. This relationship was a key factor in project success.

Case Study Results

Results

Improved System Reliability

The plant has experienced zero unplanned downtime over the six-month period following the commissioning of the new server hardware and Ignition HMI, a significant improvement over the previous months. In the six months prior to commissioning, the plant experienced up to 270 hours of unplanned downtime related to server and HMI issues. The improved operational stability, system reliability, and support responsiveness allowed them to meet increased order demand.

This stability lays the foundation for planned plant expansion, including the addition of new lines and capabilities and increased production capacity

Run Your Plant With Confidence

Request a Consultation
Execute Customized Solutions
Experience Sustainable Results

Stay Informed

Read from our blog featuring Hargrove Teammates

Newsletter sign up

Subscribe to Our Newsletter

Stay up to date on the latest Hargrove News & Insights.

Connect With Hargrove Controls & Automation

Follow us on Linkedin