CHALLENGE: Due to the facility’s capacity, a hot cutover was completed while the plant was running with one incinerator down. In addition, the client required a turnkey solution with Process Safety scope.
SOLUTION: A comprehensive cutover plan was developed. Through strong communication, the execution of the cutover was designed to eliminate and/or minimize surprises like unplanned downtime.
Summary
A leading American provider of vinyl products had obsolete control equipment in one of their manufacturing facilities. The facility produced vinyl chloride monomer (VCM), an industrial chemical and building block for other products to be used in multiple industries. In addition to obsolescence, acquisition of spare parts for maintenance was very difficult and costly.
The objective of this project was to migrate two incinerator controls from legacy to modern hardware—Honeywell TDC 3000 to C300 Experion and Schneider Triconex Version 10 to Triconex CX.
This project was a turnkey solution that included detailed design, configuration, graphics, cutover planning, construction, and startup & commissioning. Particular care was required in the cutover planning because the facility was designed to run on three incinerators. Therefore, cutover needed to be completed as quickly as possible to maintain the site’s capacity.
After consultation with all stakeholders, a documented cutover plan was developed and executed with no unplanned downtime to the rest of the site. As a result, Honeywell will support the modern DCS for 20+ years, and the reliability and up-time availability of the system have increased.
Stay Informed
Read from our blog featuring Hargrove Teammates
Why Internal R&D Matters: Building the Tools You Actually Need
by Jody Poirier, P.E. | Engineering Leader In controls engineering, no two projects are exactly the same. For example, when standard [...]
Managing Project Risk: A Proven Path to Successful Project Execution
By Jay Jones | Senior Project Manager Whether you’re managing a routine upgrade or a major capital investment, every project carries [...]
Are Outdated Operating Systems Jeopardizing Your Plant’s Reliability and Security?
By Heath Stephens, P.E. | Automation Solutions Director Control systems are typically expected to have a service life of five to [...]

Subscribe to Our Newsletter
Stay up to date on the latest Hargrove News & Insights.